The Casas Grandes vault in Mexico has been put on hold. Such a noble project by the lovely and lively Call family and one that will be finished when the time is right.

In the meantime, Winter is coming. It has rained about three out of the last five days, and is raining at the moment, having started in the night. So very soon the work will soon go inside, plastering and building the interior of the dome.
Yesterday we built a new screen for finer sifting.
We will dig dry dirt from inside the shed behind the well house. This will take the floor level down, ready for bamboo insulation, then for mudding in a floor that will eventually be polished with linseed oil. The dirt from the floor will be used to plaster the interior of the dome.
In the photo the well house is the structure with the tin roof, the shed is the structure with the tin roof connected to it. The shed is build from salvaged materials and scrap from construction sites and junk piles at private homes. A bottle wall is planned for the South wall of the shed. The east cement wall of the well house has been plastered with mud. It was not necessary and was done mainly for aesthetics and to blend with the vault which is made of dirt, water and rock.






No comments: